What is AS9102 Form 3?

Short answer

AS9102 Form 3, Characteristic Accountability, is the form in a First Article Inspection (FAI) report that records every design characteristic of a part: the balloon number, the specification and tolerance, the measured result, the pass/fail determination, the inspection method and the gage ID. It is what ties each measurement back to a specific ballooned feature on the engineering drawing.

Form 3 is the largest and slowest part of a FAIR package. Form 1 is a header. Form 2 is a list. Form 3 is one row per characteristic — and a single aerospace bracket can carry 85 to 150 ballooned characteristics before you count the nonconformance documentation.

Form 1 vs Form 2 vs Form 3

FormTitleWhat it contains
Form 1Part Number Accountability Part number, part name, drawing revision, serial/lot, organisation, the FAI itself and whether it is full or partial. Also identifies the person who performed the inspection.
Form 2Product Accountability — Raw Material, Specifications and Special Processes Raw material, material specifications, special processes (heat treat, plating, NDT), supplier codes, cert numbers and the traceability chain.
Form 3Characteristic Accountability Every ballooned design characteristic with its specification, tolerance, measured result, pass/fail determination, inspection method and gage ID.

AS9102 Form 3 fields, field by field

FieldTypical contentNotes
Characteristic number1, 2, 3… The balloon number. This is the join key back to the drawing; without it a measurement is unverifiable.
Reference locationDrawing zone, sheetWhere on the drawing to find the feature.
Characteristic designationKey, Critical, Major, Minor Key and Critical characteristics are subject to stricter control and often 100 % verification.
Specification / requirementØ12.000, Flatness The nominal or the requirement as written on the drawing.
Tolerance+0.050 / -0.050 May be bilateral, unilateral or asymmetrical. Upper and lower limits are derived from nominal and tolerance.
Measured result12.013 The actual value from the inspection, or from a CMM report.
Pass / Fail determinationPass, Fail Whether the measured value falls inside the specification limits.
Inspection method / toolingCMM, micrometer, caliper, gauge How the value was obtained. Matters when a customer challenges a measurement.
Gage IDMC-0142 Links to calibration records and to the Measurement Systems Analysis study that PPAP Element 8 requires.
Nonconformance / NC codeNC-02, Critical / Major / Minor Classification of a failed characteristic, and the escalation path it triggers.
DispositionAccept, Rework, Scrap, Use-As-Is What happened to the nonconforming feature. Use-As-Is requires customer deviation.
Inspector / authorityName or initials ISO 9001:2015 clause 8.6 requires the report to identify the authority responsible for release.

Why a single number is meaningless on its own

This is the part that makes Form 3 harder to digitise than an invoice. An invoice line is a self-contained value: find the number, copy the number. A dimensional measurement is a relational value.

Reading: 1.2503″
Meaningless by itself.
Nominal: 1.2500″
Now you know the target.
Tolerance: ±0.0005″
So the upper limit is 1.2505″ and the lower limit is 1.2495″.
Conclusion
The reading is in tolerance. A reading of 1.2506″ on the next part would be out of tolerance and would require an NC code.

Template-based OCR fails here because it treats each field as an isolated box and discards exactly the relationships that give the measurement its compliance value. That is why a converter has to understand which number is the nominal, which is the tolerance band and which is the actual reading — not merely read characters off a page.

AS9102 vs GJB 908

If you are working in the Chinese aerospace supply chain you will meet two similar-sounding documents. They are not interchangeable, and they use different form templates.

 SAE AS9102GJB 908
English termFirst Article Inspection (FAI)First Article Qualification
Applies toCivil aviation, international collaboration programmes, aerospace and defence organisations on an AS9100-based QMSChinese domestic military programmes
Form templatesThree: Part Number Accountability, Product Accountability, Characteristic AccountabilityFour, including a production process route card and a qualification review report
DeterminationComplete / Not completeQualified / Not qualified

In practice many organisations in China run both systems side by side, and a supplier serving a civil customer may be required to submit an AS9102 report even though its own internal route card follows GJB 908. This tool implements AS9102 only.

How to get Form 3 into Excel

  1. Retype it. Reliable, and the reason the task consumes hours per report.
  2. Paste the table. Copy the Form 3 table out of the PDF and paste it into a parser. Fast, but you still have to clean the columns.
  3. Use a converter. Drop the PDF in and get a 15-column spreadsheet with per-row source traceability. This is what AS9102 to Excel does.
What a converter should not do. It should not calculate pass/fail from the tolerance, and it should not claim to produce a compliant FAIR package. Determining conformity is a quality decision that has to stay with your inspection authority. A converter that "decides" for you creates a second thing to audit.