What is a FAIR?

Last reviewed: 17 October 2026

FAI and FAIR get used interchangeably, and that causes confusion in exactly the conversations where precision matters. One is an activity. The other is the document that proves it happened.

The short answer

What a FAIR contains

  1. The ballooned drawing or model, with every design characteristic, note, material requirement and surface finish identified by number.
  2. AS9102 Form 1 — Part Number Accountability, which identifies the part and its configuration. What each form covers.
  3. AS9102 Form 2 — Product Accountability: material and special process certifications.
  4. AS9102 Form 3 — Characteristic Accountability: every characteristic with its requirement, tolerance, measured result, determination, method and gage.
  5. Supporting evidence where required — certifications, test reports, nonconformance records.

FAI is process verification, not just part inspection

This is the part that gets lost. A FAI is not “inspecting the first part carefully”. It is a verification of the process: evidence that the manufacturing process, as set up, is capable of producing parts that meet the design requirements.

That is why a FAI has to be repeated when the process changes, not only when the design does. A new machine, a new fixture, a new supplier for a special process, or a long production gap all undermine the original claim, because the process the FAI validated is no longer the process in use. Full versus partial triggers.

How to tell a complete report from a fragment

CheckWhy it matters
All three forms presentMissing Form 2 means material and process evidence is absent, even if every dimension was measured.
Form 3 numbers match the ballooned drawingIf they do not match, the measurement cannot be traced to a feature.
Every balloon has a Form 3 rowA balloon with no row is an unmeasured characteristic. A row with no balloon is unattributable.
Nominals and tolerances recorded separatelyA measurement cannot be judged against a requirement that is not stated.
Gage IDs presentWithout them, values do not trace to calibrated instruments.
Part number and revision agree across all formsMixed revisions are a common cause of rejection.
Partial FAIs reference the baselineA partial FAI only makes sense as a delta against an earlier, identified report.

Why the paperwork is the hard part

The inspection itself is well understood. What consumes time is assembling the evidence: ballooning the drawing, getting measured values into a structured table, matching them to the right rows, and keeping revisions aligned across three forms.

On a part with several hundred characteristics, that assembly work is measured in days. On a simple bracket it is an afternoon. Either way it is data handling rather than engineering judgement, which is why it is the part people look to automate first.

This is orientation, not the standard. AS9102 is published by SAE International and is revised from time to time. Field names, requirements and trigger conditions can change between revisions, and your customer’s flowdown can be stricter than the standard. Always work from the current published edition of AS9102, and from your own contract and quality system. Nothing on this page is compliance advice.
Retyping these columns by hand? The converter reads an AS9102 Form 3 and fills all 15 columns for you, in your browser, with nothing uploaded. Three pages free, no account.

Frequently asked questions

What does FAIR stand for?

First Article Inspection Report. It is the documented deliverable produced by a first article inspection, normally containing AS9102 Form 1, Form 2 and Form 3 plus the ballooned drawing that Form 3 references.

What is the difference between FAI and FAIR?

FAI is the activity, the first article inspection itself. FAIR is the report, the package of forms and evidence you submit to demonstrate that the inspection was performed.

What is the difference between AS9102 and AS9100?

AS9100 is the aerospace quality management system standard, which requires first article inspection to be part of your controlled process. AS9102 is the standard that defines the FAI requirements and the forms used to report them.

Does a FAIR need the ballooned drawing?

Form 3 rows are keyed to balloon numbers on the drawing. Without the ballooned drawing there is nothing to tie a measurement back to, so characteristic accountability cannot be verified.

Sources

Standards are revised. Always work from the current published edition of AS9102 from SAE International. This page is orientation only and is not a substitute for the standard.

Related